B.Sc. Project
There was no thesis in our B.Sc. program but an internship project. I did this project in SNOWA which was one of the largest home appliance factories in Iran. My project was about balancing a washing machine assembly line. It was a two-sided assembly line with more than 40 stations.
Interaction with practitioners in this factory inspired me some ideas for presenting a paper. In this paper, I considered the optional but influential relationships between tasks in balancing a two-sided assembly line. I defined an objective function for these optional relationships, and tried to find solutions with the least number of stations and mated-stations and maximum consistency between the tasks assigned to each station.